New Workshop

truss layout

dGU2if.jpg


235 miter cuts later

ZE4OjP.jpg


one stack

IjVBZU.jpg

oh look ray tracing :lol:




now i hace to cut 120 plywood gussets and build a large jig 20 feet by 12 feet in the carport to put them toghter and glue and woodscrew them together

went to home depot today for 24 - 2x10's x 20 feet 59 bucks each and everyone they had was warped and split 3 foot in on both ends = worthless :down:
 
Last edited:
SD-[Inc said:
;n11058031]No windows? What are you going to be building in there?

:lol:

had windows in the old workshop they just attracted spiders and bugs and make it harder to cool and are always dirty
and since it will have two mini splits and the walls will have 2 inch R13.1 foam board insulation plus R23 rockwool insulation

why would i want a widow in a R36+ wall when it's 115f+ outside
and it is better to have only one type of light in a shop, and you can get odd shadows with over head lights and windows when laying out stuff
 
:lol:

had windows in the old workshop they just attracted spiders and bugs and make it harder to cool and are always dirty
and since it will have two mini splits and the walls will have 2 inch R13.1 foam board insulation plus R23 rockwool insulation

why would i want a widow in a R36+ wall when it's 115f+ outside
and it is better to have only one type of light in a shop, and you can get odd shadows with over head lights and windows when laying out stuff

Ventilation?
 
got the 2 doors one upstairs on one end and the main door and will put in a two vent fans with a damper to the overhang in front with a bug screen
for when i'm doing anything with fumes

i will put two 8 inch round vent ducts or maybe 2 6x10 ducts before the upstairs floor goes in and the fans later
 
inspector Abby
MIllt7.jpg

temp covered - got 10 sheets of 3/4 inch osb flooring on top and and a tarp


ZZ2W1n.jpg
126 gussets cut
oEzqV0.jpg

each of 21 trusses takes 6 gussets and 7 boards all cut and ready - finally

glue jig finshed
FcxaKx.jpg


ready to start glueing the gussets and screwing and ring nailing them on - tomorow

FGLhAD.jpg
3 gussets on each side
 
Coming along nicely... that serious framing on the roof putin up second floor?
 
Nice. Roomy 2nd floor... Put in a shop elevator or just stairs for the second floor?
 
door is in upstairs and now fully dried in even if the shingles are not up fully, it is now lockable and i'm starting to put stuff back in


lYgZoG.jpg
cMzoYn.jpg
 
Back
Top